Electric pump downhole installation steps

Electric pump downhole installation steps 0. Acceptance of the unit: go to the logistics company to carefully check the acceptance of the cable jacket to see if there is no damage. Whether the unit is broken. 1. Handling: Loading and unloading car to be careful, so as not to damage the unit's concentricity or break the cable insulation. 2. Machine pump into one of the electric pump inspection process prior to the well: A. disassemble the network, use the pry bar toggle coupling should be flexible, B. See step 3. C. Place the unit on the outlet of the pump and add detergent powder water. At the same time, slightly move the motor start button to observe the steering of the pump. The time should not exceed 3 seconds, and the mark should be continued. 3. Pump split body assembly steps: A. Installation of the unit vertical stand, open the vent hole and water injection hole, be sure to be two water blocking are open, fill the water will fill and plug the water plug, observe the motor Is there a water leakage phenomenon, such as the phenomenon of water leakage must not go down, the reason may be bump in the transport process should be promptly contact the agents or manufacturers to discuss until no leak (observe 10-15 minutes). Then shake the motor insulation resistance, its value is not low and 50 megohms. B. bandage cable connector, wrapped and then try the motor steering, motor steering in the direction of the arrow marked on the pump is consistent, and make the follow-up mark. 4. On-site assembly: Assembly step A. The pump casing removed to expose the top of the impeller, B. Impeller rotation by hand to see if it is flexible C. Pulling the impeller in the direction of the pump shaft to observe the total amount of the impeller up and down the total channeling (general QJ pump 4 -6 mm) D. Install the coupling and motor together into one so that the motor shaft and the pump shaft head tight not allow a gap. E. See the impeller up and down the amount of clearance, it should be in the middle of the total amount of channeling (tolerance ± 0.5 mm). F. deviations of greater than 0.5 mm with adjusting shims to adjust to the middle of the manual rotation of the impeller should be flexible. G. Then drill the top hole of the coupling, tighten the top wire to install the upper shell. H. Once again use the pry bar toggle the coupling should be flexible and fit for a week. 5. The crew went down well: Before hanging down, use a rope to hang a round log with the same length of the unit (the diameter is equal to the maximum outer diameter of the unit) to test whether the test well pipe is straight. In order to avoid stuck wells when the next crew. (Especially the new wells under the first pump). 6. Banding of cables: The cables should be bound to the pipe with insulated cable tie, do not use wire. 7. Unit Control and Startup: Control Equipment Selection. Motor power × 1.2-1.4 times = control cabinet power. Control cabinet to have phase, overload, over current and short circuit protection. After the wells have been installed, the test machine is started. The start-up time is 10-25 seconds depending on the motor power. The start-up time of the high-power motor should be relatively long. Check if the current is overloaded and the three-phase current is balanced. And feedback manufacturers as a basis for warranty. 8. Overload, overcurrent, phase loss, short circuit, sensitivity debugging: This step is very important, please install the staff to debug carefully. A. Overload overcurrent debugging: The thermal relay current adjustment knob, slowly smaller than the actual operating current direction of rotation, each rotating a small scale, at intervals of 2 minutes until the thermal relay stop working until the unit. Then reverse the rotation a little scale can be. B. phase loss sensitivity debugging: the unit to start again, and one by one to disconnect the switch fuse switch unit, the unit is in two-phase power state. Observe if the thermal relay shuts off the control power within 5 seconds. C. Short circuit test: This step is usually to rely on the power supply system to protect the air switch. Generally not for field test (more dangerous) requires the power supply system must be equipped with air switch (air switch model preferred DW10, second choice DZ). The above eight units please use the installation and commissioning personnel, electrical and mechanical maintenance personnel carefully read!

PCD Grooving Inserts

OPT Cutting Tools Co., Ltd specialize in offering a comprehensive gamut of PCD diamond inserts, all of the products are used to machining for cast iron, non-ferrous materials, high-temp alloys, hardend materials.

PCD grooving that are to your specific width and depth requirements. We possess the ability to grind special groove, chamfer, and form tools. Tolerances of 2 microns are consistently held on our grooving insert`s geometry and edge preparation.


PRODUCT DETAIL:

pcd grooving inserts

pcd grooving inserts


pcd inserts

pcd inserts

product catagory :

Diamond inserts identification


PRODUCTING PROGRESS:

4product detail-fanyi

PAYMENT AND DELIVERY:

PCD Inserts

PRODUCT EQUIPMENT :

product equipment


ABOUT US :

We are specialize in manufacturing PCD diamond tools and Carbide tools. Our major product inclulde PCD Inserts , PCD Reamers , PCD End Mills, PCD Taps, Cabide Inserts,Carbide Drills, Carbide Reams, Taps etc., we also offered customized cutting tools per drawings, and provide package according to customer requirements.


We manufacture a series range of cutting tools for machining of Cast iron, Aluminium alloy and Non-Ferros metal, it is widely used in all major sectors like Automobiles, Engineering, Aerospace, Aviation and 3C industry. Premium quality of raw material is used in the production and strict examination during processing with advanced equipment, so our client are satisfied with our reliable quality and on-time delivery.


Our best selling of cutting tools include PCD Inserts, PCD End Mill, PCD Ball Nose Mill, PCD Reamer, Carbide Taps, Carbide End Mill, Special Form Cutter and many more. For these years we have been made a large forward in the technologies of manufacturing cutting tools. With high quality on performance and price, our product sells well both on domestic and overseas market. And we will always focus on the quality and best service, to make long business relationship.

PCD Inserts

quanlity control:


We have dedicated team of quality control and precise equipment to keep good and stable performance for our products and processing services.

great service



Grooving Inserts,Grooving Tools,PCD Grooving Tools,PCD Grooving Inserts

OPT Cutting Tools Co., Ltd. , https://www.optdiamondtools.net