What is the step of installing the high speed ball?

[ Huaqiang Security Network News ]
After selecting a high-speed ball, it does not mean that its work has been completed. Another important step is to install and debug the high-speed ball. The debugging and installation are very important. If the two steps of debugging and installation are not done well, Will affect the performance and effect of the high-speed ball, so we must pay attention to the process of debugging and installation, the following teaches you how to install and debug the high-speed ball.
Tools required for high speed ball installation
The power supply and power supply are stable and meet the requirements of the high speed dome camera manual.
The number of power lines, network cables, video cables and control lines must be matched with the wiring ports of the high-speed dome, preferably the original factory line.
A high-speed ball machine has been selected, the quality must be good, and must meet their own requirements, otherwise the test will be mistaken for product quality problems.
High speed ball installation steps
1. As shown in the figure below, the installation diagram requires that the high-speed dome be connected to the power supply. The grounding line should also be installed to prevent the circuit from being burnt out and to protect the circuit.
High speed ball installation
2. Install the high-speed dome camera in a stable place according to the requirements. The surrounding environment should be stable and there should be no vibration. Otherwise, the screen will appear jittery or unclear, which will affect the actual visual effect. The places where the water vapor is heavier should also be avoided to avoid the high-speed ball machine being damp and damaging the internal components. It should also be noted that there is no object around the lens to avoid affecting the high speed dome.
3. Connect the whole system according to the following circuit diagram. When connecting the high-speed ball machine to the computer connection line, pay attention to the line of the interface must be tight, otherwise the line will be short-circuited and open circuit after a period of time. The installation of the high speed dome machine is completed in this step.
High speed ball installation
4. Finally, set various parameters on the control end, including the color degree of the picture, brightness and color balance, and other parameters until the picture is satisfactory. The final debugging work is also completed.