Golden Share Mining Corporation (TSXV:GSH) is pleased to announce the launch of a follow-up diamond drilling program within Band Ore's main target area, located in the Shebandowan Gold Project (SGP) in northwestern Ontario, Canada. The two-stage diamond drilling program will include seven boreholes with a total length of 1,100 meters to optimize the company's latest model for the Band Ore area, which confirms the existence of sub-parallel mineralization zones within the project area. The model was built based on supporting evidence from the 2011 SGP work programme, including results from historical data compilation, geological mapping, structural analysis, high-resolution resistivity and polarization surveys, and more recently in the main mine of Band Ore. The drilling results obtained in the main southern mining area of ​​Band Ore, about 100 meters south, Golden Share recently announced the following preliminary preliminary drilling results for the area: - 2.70 meters of gold grade from 17.00 meters to 35.70 meters at 17.85 grams / ton The mining section (including the 1.00-meter mine section with a gold grade of 47.70 g/t) - the 5.50 m section of the gold grade of 2.80 g/t from 62.50 m to 68.00 m (including 0.30 m of gold grade of 35.90 g/t) The mining section) - The second phase drilling program of the 1.70 m mine section with a gold grade of 1.39 g/t from 73.00 m to 74.70 m is expected to be completed in mid-April. Other results of the one-stage drilling program for the main target area of ​​Band Ore have yet to be announced.
B-F-B-ic international Ltd.co , https://www.ledgather.com