Steps for water and electricity renovation steps for interior wall decoration

Renovation is what people do when they buy a new house. It is also something to do when renovating the old house. What are the steps for installing water and electricity for the new house? What should we pay attention to when decorating the wall? You are also a person who needs to decorate the house. If you want to know about these situations, let's take a look at the steps of the decoration together with the small series of the decoration home network. I hope to help you.


装修的步骤


First, the interior decoration hydropower installation steps


1, slotting

First thread and then slot. Pipeline grooving must be parallel and vertical as required (if there is a hydraulic construction drawing, the construction drawing is better). The lines that must be paralleled are always controlled at 60-90 cm high (from the ground), and the pipes with faucets must be vertical.


2, installation

The pipeline is divided into cold water pipes and hot water pipes. Hidden pipes are used to prevent the use of galvanized iron pipes. First, through the construction drawings, the construction personnel and the owner discuss the water location and use functions. Arrange the hydropower master to discharge the installed faucet and water location. If there is a construction drawing, it can be arranged according to the construction drawing. If there is no complete drawing, communicate with the owner to increase the on-site positioning waterway function.


3. Inspection

Waterway pipeline inspection is of vital importance and is related to future waterway safety hazards. We usually use the pressure test method for pipeline inspection. Pressure test is one of the ways to check the leakage of the pipeline. First block the inner wire with a plug. Test with a pressure gauge (6-8 kg for home improvement). Check the pipe joint after pressing. The second method is to open the sluice for two days and two nights after the bet, and check the joint on the third day. Take the previous method normally.


4, waterproof

After the installation of the water pipeline, seal the toilet trunk with cement sand (the floor of the bathroom and the kitchen should not be slotted as much as possible). After the line trough and the ground are dry, the ground and the wall surface are cleaned again. The water on the wall surface can be made waterproof, and the wall surface is made waterproof more than 80cm. If there is a furniture wall on the back of the kitchen wall, it must be filled. Play a moisture-proof role in furniture. The first time to enter the site to do waterproof is to be able to determine that the ground will not leak. After the pipeline is installed, the wall surface can be done once again to make the ground and wall surface more effective in waterproof protection. In the acceptance of hydropower projects, it is necessary to check whether the waterproofing is qualified.


5, circuit slotting

After discussing with the owner the power function and requirements, the electrician will pay the bottom and play the parallel and vertical lines. Place the switch socket bottom box. The socket is slotted 40 cm from the ground, and the hanging air-conditioning socket is slotted 2.2 m from the ground. The switch is slotted 1.2-1.4 m from the ground. The bottom of the switch socket should be installed with a horizontal line slot. The kitchen and bathroom rooms must be slotted according to the designed function. There must be a lock on the concealment.


装修的步骤


Second, the interior decoration steps brush wall considerations


1. Prevent too dry

During the painting process of interior decoration wall, it is necessary to pay attention to the change of air humidity. If the humidity is too high, the interior decoration wall will dry very slowly, which will not only affect the progress of the project, but also affect the interior decoration wall painting in the decoration. The quality; if it is too dry, it will make the interior decoration wall dry too fast, and the crack will occur, so it will not be worth the loss.


2, the color of the paint should pay attention to

If you like the darker living room space, you will naturally choose a darker paint. It should be noted that when using dark paint, try not to add any thinner to the paint. The paint we used did not show chromatic aberration, and if the color difference was slightly noticed, the whole room would be difficult to read.


3, pay attention to fire prevention during dry season

This kind of paint, such as interior decoration wall, is relatively flammable and explosive, so pay special attention to fire prevention during the dry season to avoid accidents due to temporary ambiguity. At the same time, when choosing materials such as interior decoration and painting walls, pay more attention to the relevant national standards. Some paints do not seem to have much problem, but they are not strictly enforced according to national standards on some issues such as safety. It is also very dangerous to use. of.


Hydropower is an important part of a family. We should pay attention to it during the renovation. We must understand the steps when decorating the water and electricity. There are also a lot of things we need to pay attention to when painting the wall. Everyone knows about these issues. If you want to know more about decoration, then continue to pay attention to the decoration home Internet cafe.



More related wonderful reading:

The method of hotel decoration introduces the steps of hotel decoration

The steps of the renovation of the new house introduce the six steps of the renovation of the new house.

The steps of bathroom wall decoration, precautions when decorating the wall

Automatic Bearing Ring Lathe Machine

Designed for large cutting allowance and big size scatter forging piece.Used for turning bore, face, outer diameter, step, etc,with the advantage ofgood cutting force, blank adaptability and automatic processing. It is aimed atsolving recruitment difficulties and labour intensity, widely used in rough turningfor bearing ring ,auto parts, casting and forging hydraulic industry ,etc.

Automatic Bearing Ring Lathe Machine,Taper Roller Bearing Machine,Outer Bearing Ring Machine,Inner Ring Bearing Machine

Shaoxing Sunfong Intelligent Equipment Inc. , https://www.zjsxsunfong.com