Hydropower materials price list

In all decoration projects, the budget of hydropower materials must be taken into account to avoid unnecessary expenditures. As a concealed project, hydropower reform is the most important aspect of renovation and is also the beginning of renovation. It is also the main profit point of home improvement companies. one. Secondly, there are many places that need to be paid attention to in the inspection and acceptance of the house. At present, the inspection and acceptance of the home improvement project is based on the relevant decoration acceptance standards. The decoration company should carry out the quality inspection according to this minimum standard. The hydropower project is not up to the standard. If quality problems are not discovered in time, it will be very troublesome to rework it later. Therefore, for the home improvement check, strict acceptance of the hydropower project is an essential part of the renovation. That's where Xiao Bian talked about what needs to be paid attention to in the inspection and acceptance of water and electricity , as well as the list of prices of water and electricity materials . I hope to help everyone.

Water and electricity renovation acceptance what need to pay attention to matters

As with the acceptance of all projects, the acceptance of hydropower must first be carried out on the acceptance of materials and the acceptance of appearance. Check whether the specifications of the water pipes, bushings, wire rods, etc. used in the water and circuit reconstruction are the same as the specified materials. All materials purchased must meet the national testing standards to prevent product failure.

The second is to examine the layout and construction of the water circuit to see if there are any scratches on the surface of the material, and then check the installation of the line and the pipeline, and whether the alignment is consistent with the original design drawing. Make sure all outlets and outlets and drains are in the correct position. Check whether the positioning of the inspection and cassettes meets the requirements of symmetry and consistency. If there is a change in the layout of the pipeline, it is important that the construction party provide a copy of the water and electrical wiring diagrams after the renovation.

Circuit acceptance points:

Circuits have the same impact on life as waterways, and they add a bit more danger than waterways. Therefore, the acceptance must be more stringent.

1, strong and weak electricity should be separated

The family usually uses AC power. Some construction teams directly store all the wires together for the convenience of construction. Power lines, network cables, telephone lines, etc. are all placed in the same bottom so that the lines can be disturbed and the signals are not affected. stable. It will also lay a hidden danger for home fires. The strong and weak electricity should be routed separately. It is strictly forbidden to share one pipe and one bottom box for strong and weak electricity. The parallel distance of strong electricity lines should not be less than 3cm, preferably 50cm, and the crossing must be a right angle.

2, wire and casing

Some irresponsible construction parties will directly bury the wires in the wall during construction. The wires are not covered with insulating tubes, and the wire connectors are directly exposed. This can easily cause safety hazards and is a typical phenomenon of cutting corners. The specification of the laying of wires is clear and there must be protection of the insulation sleeve outside the wires. The joints cannot be exposed. Pay special attention to this when checking.

3, check whether the socket wire is installed arbitrarily

Many families use slotting and dark pipe laying for aesthetic reasons. When wiring, we must follow the "fire line into the switch, zero line into the lamp" principle, but also set leakage protection device on the socket.

Waterway inspection points:

There are many matters needing attention in the waterway construction. When checking, you can compare the construction precautions and check whether the waterway in the home meets the specifications.

1. Location of hot and cold water pipes: The installation of hot and cold water pipes follows the rules of “heating and cooling, left and right cooling”. The pipes installed above and below must also pay attention to the parallelism between the two pipes. If the water pipe is close to the gas pipe, the distance between the two pipes must be greater than 50mm.

2, water pipe fixation: laying a good section of pipe, the pipe must be fixed. So as not to lay a good pipe position shift, causing unnecessary trouble.

3, water and gas location: the installation of water pipes shall not be close to the power supply, the spacing between water pipes and gas pipes shall not be less than 50mm.

4, pipe regulation: check the direction of the upper and lower water should be reasonable, horizontal and vertical layout, there is no excessive corners and joints.

5. Attachment installation: Check whether the accessories are tightly connected and have no leakage; whether the water outlet is smooth or not, and whether the water meter is running normally.

6, pressure test: After the waterway transformation done, must do the pressure test of the water pipe, which is the common method to ensure the reliability of the water pipe connection in the later period. The pressure test is generally completed by the decoration company, the owner and the project leader.

Hydropower material price list

(1) List of hydropower reform materials:

1. Circuit part:

Wires: wires, single-core wires, single-core wires, network cables, telephone lines, video and audio cables, and network plugs.

Accessories: wire tubes, three links, cassettes, elbow springs, box joint locks, box joint locks, direct heads, direct heads, waterproof insulation tapes, waterproof tape, broadband network TV a little bit TV distribution box , circuit breakers, horizontal tubes.

Switch: Switch single control, dual control, single control, single control, dual control, dual control, three control

Socket: Socket (23 eyes), Socket (22 eyes), Air conditioning socket (16A), Socket (3 eyes) (10A), Single-link 500Hz video socket, Single-link 500Hz video socket, Dual 500Hz video socket, Computer / Telephone socket, audio socket, whiteboard.

Lamps: Kitchen Lights Kitchen Work Lights, Guard Lights, South Balcony Lights, Northern Balcony Lights, Living Room Lights, Restaurant Lights, Master Bedroom Lamps, Fluorescent Lamps, Fluorescent Lamps, Fluorescent Lamps, Mirror Lights, Down Lights, Cold Light Lamps, Cold Light Lamp Transformers , bedside lamp, master bedside lamp.

2. Waterway section: PPR pipe, washing machine faucet, bathroom basin faucet, kitchen sink, basin, toilet, single towel rack, double towel rack, towel rack, paper holder, makeup mirror, toilet brush, water: accessories Triangle valve.

【一】Strong Price [Project] Project Unit Price

Dark pipeline 2.5mm232 yuan / meter · Single tube decorative open line 2.5mm222 yuan / meter · Single tube Ming pipeline 2.5mm218 yuan / meter

Installation cassette 86 × 86 10 yuan / installation box 86 × 865 yuan / month

Wear wall eye-bearing wall 40 yuan / non-bearing wall 15 yuan / month

Box black box 200 yuan / a mounted 100 yuan / month

【二】Waterway reconstruction

Waterway renovation construction quote

Dark pipe PP-RDNS2.820mm38 yuan / extension meter tube PP-RDNS2.820mm28 yuan / extension meter

Dark pipe PP-RDNS3.525mm55 yuan / extension meter tube PP-RDNS3.525mm46 yuan / extension meter

Through wall hole load-bearing wall 50 yuan / hole over wall hole non-bearing wall 20 yuan / hole move water meter 200 yuan / only

Valve DN2590 yuan 1 valve DN2070 yuan 1

[three] lighting installation and panel

Lamps install spotlights or downlights 16 yuan / month

Ceiling lamp 30 yuan / chandelier 60 yuan / month

Switch and socket installations are subject to a charge of 30 yuan or less for 7 yuan/piece, 30 yuan for 5 yuan/piece, and light strip with 30 yuan/piece.

Additional information:

1. The hydropower installation quotation for 2012 includes pipes, wires, wiring, construction, slotting, and pressure tests. Does not include sealing slots, does not include waterproofing, and installation of sanitary ware. Charges are calculated based on actual metered usage.

2. The waterway reconstruction does not include special fittings and valves. The accessories need to be purchased by the owner himself.

3, high-rise steel reinforcement pouring structure per meter plus 3 yuan slotting, coincidence plus 3 yuan each.

4, hot and cold water pipes all use hot water pipes, due to the owners of the design is not in place and after the installation of pipelines artificially damaged on-site maintenance need to receive manual fees.

Note: The above information is for reference only.

Summary: The above is related to the price list of water and electricity materials and the need for attention in hydropower renovation acceptance. It is for reference only, and it hopes to help everyone. If you want to know more related information, you can pay attention to this website information.

Hydropower installation and acceptance of hydropower

Flap Disc Adhesive Glue

We supply full range of abrasive tools, such as Flap Disc adhesive, Flap Disc Backing Pad, Abrasive Flap Disc, Flap Wheels , flap wheel with shaft, Abrasive Sanding Disc, Abrasive Machine , etc...

both one component epoxy adhesive and two component epoxy adhesive.

Specifications for single component epoxy adhesive for flap disc:


Appearance: Colloidal

Color: Blue / White

Odour: Slight odour

Proportion(water=1):1.42

Viscosity (25℃, mpa.s): 15000~20000

Storage time: 5℃ 6 months

Recommended curing condition: 110~130℃×4~3 hours or 150~160℃×1 hour

Hardness(Shore D): ≥90

Recommended temperture on the machine: 40-52 degree

Shearing strength(23℃, steel/steel, MPa): ≥22



Flap Wheel Glue Instructions

According to the ambient temperature, preheat adhesive among 41 ~ 46℃ before pumping into the pumping system.

Note:

1.When climate is colder, adjust preheating temperature 3 ~ 5℃ higher than normal.

2.Before use large quantities,a small quantity should be used for test.

3.This flap disc glue is a chemical product, can cause weak corrosive to skin, please note that the use of the appropriate protection, such as inadvertent contact with the skin with plenty of water rinse or alcohol wash.

4.Baking temperature is particularly important for product quality. The data provided by us is tested under accurate oven temperature control. We are strongly advised customer should adjust oven temperature according to the customer's on site condition.

Storage and transportation

Flap Disc Adhesive resin glue should keep in cool, ventilated warehouse, temperature does not exceed 40℃, relative humidity of not more than 85% ,this product is not special goods, according to the general cargo transport.

Flap Disc Adhesive Glue 7


Single Component Flap Disc Adhesive Glue 10 Jpg

Flap Disc Adhesive Glue,Flap Wheel Glue,2 Component Epoxy Glue,Flap Wheel Adhesive,Epoxy Resin Flap Wheel Glue

Zhengzhou Jiading Abrasive Manufacturing Co.,Ltd , https://www.jiadingabrasive.com