(1), engineering process
Install the embedded parts, install the column, and install the column armrests and the column to polish and polish.
(2), install embedded parts (post embedded parts)
This project is a decoration renovation project. The installation of the embedded parts of the balustrade can only be carried out by using the post-embedded parts. The method is to use the expansion bolts and the steel plates to make the rear connecting parts. First, lay the lines on the civil construction base to determine the position of the fixed points of the columns, and then on the stairs. Drill holes with impact drills, and then install expansion bolts. The bolts are kept at a sufficient length. After the bolts are positioned, the bolts are tightened and the nuts and screws are welded together to prevent the nuts and steel plates from loosening. The above method is also adopted for the connection of the armrest to the wall surface.
(3), release line
Due to the above-mentioned post-embedded construction, there may be errors. Therefore, before the column is installed, the line should be re-released to determine the position of the buried plate and the accuracy of the welded pole. If there is any deviation, correct it in time. It should be ensured that the stainless steel columns are all seated on the steel plate and can be welded around.
(4), install the column
When welding the column, it is necessary to cooperate with two people. One can hold the steel pipe to keep it vertical, and it can't shake when welding. The other person applies welding, and it should be welded around and should meet the welding specifications.
(5), handrail and column connection
Before the column is installed, the wire is laid by the extension line, and the groove is machined at the upper end according to the inclination angle of the stairs and the roundness of the handrail used. Then put the handrail directly into the groove of the column, and install the spot welding from one end to the other end. The adjacent handrails are installed correctly and the seams are tight. After the adjacent steel pipes are butt jointed, the joints are welded with stainless steel welding rods. Before welding, the oil, burrs, rust spots, etc. within the range of 30-50 mm on each side of the weld must be removed.
Square Music Dry Spray Fountain
Our company is mainly engaged in the design, production and construction of various waterscape fountains. The company has contracted to build various types of fountains at home and abroad, and years of design and construction have accumulated rich experience and abundant human and material resources for us.There are various kinds of dry sprays, with lights, water curtains and music interwoven and widely used.
Square Music Dry Spray fountain,Dry Fountains,Dry Deck Fountain,Park Water Fountain
Wuxi Jinshanghua Environmental Equipment Co., Ltd , https://www.jshfountain.com