CE&ISO certificated Quality Brass Casting Bibcock (AV2015)
1)Material: Brass (CU>57%, Pb<2%)
2)Component: Casting body with aluminum handle, zinc handle also can be offered
3)Thread stand: ISO228
4) Pressure: PN16
5)Meduim: Water
6) Nozzle: brass . stainless steel available
7)Handle : Aluminum or Brass
6)Certificate: ISO9001:2008, CE,SGS
Mould No. | Â 2.Material: | 3.Technics: |
4.Packaging & Delivery |
 |  |
AV2015 |
Body-Brass:Hpb 57-3Hpb 59-1CW617NCW614NDZRlead free brass Bonnet-Brass as above Stem-Brass with chrome plated OR iron with chrome plated or not Sealing-PTFE(Teflon) OR plastic |
Temperature: -20°C≤T≤150°C Pressure: P≤3.0MPa=30bar=435psi Medium: Water Thread: ISO228 standard-BSP, NPT Surface treatment: brass yellow,nickel plated,chrome plated, polished.  |
Packaging Detail:plastic bag,inner box and outer export standard carton  |
 |  |
1/2"X1/2" | Delivery timel:35~40 days | Â | Â | ||
 |  |  |  |


OUR SERVICES

Samples:
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you
Price Terms:
FOB, CNF,CIF.etc.
WE ACCEPTÂ MANY RATE , SUCH AS RMB, US DOLLAY, EUR, KORAD, POUND..ETC
Payment Terms:
1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance,  D/P
Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2)Â We will start to have mass production when confirm our sample and 30% T/T deposit received.
3)Â Quality is under the control and supervision during the production.
4)Â Packing information will be confirmed before the production finished, If no special requirment, using our normal package.

Quality control and inspection:


1)Â Will be check by QC when Material & accessories inspection up arrival
2)Â In line control on Each Step
3)Â Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
5)Â Third Party inspection Such as CE, SABS and so on
6)Â Original authorization through ISO9001:2008
Passenger Elevator Buffers
Panoramic Elevator Buffers
Home Elevator Buffers
Hospital Bed Elevator Buffers
Freight Elevator Buffers
Car Elevator Buffers
Service Elevator Buffers
Goods Elevator Buffers
MRL Elevator Buffers
Machine Room Elevator Buffers
Residence Elevator Buffers
Automobile Elevator Buffers
OTIS Elevator Buffers, Thyssen Elevator Buffers, KONE Elevator Buffers, GiantKONE Elevator Buffers, ThyssenKrupp Elevator Buffers, Schindler Elevator Buffers, XJ Schindler Elevator Buffers, Xizi OTIS Elevator Buffers, Mitsubishi Elevator Buffers, Shanghai Mitsubishi Elevator Buffers, Fujitec Elevator Buffers, Hitachi Elevator Buffers, Toshiba Elevator Buffers, Hyundai Elevator Buffers, LG Elevator Buffers, Sigma Elevator Buffers, Express Elevator Buffers, GUANGRI Elevator Buffers, FUJI Elevator Buffers, BLT Elevator Buffers, CANNY Elevator Buffers, SJEC Elevator Buffers, KOYO Elevator Buffers, IFE Elevator Buffers
Elevator Buffer,Elevator Polyurethane Buffer,Elevator Safety Parts Oil Buffer,Residential Elevator Oil Buffer
CEP Elevator Products ( China ) Co., Ltd. , https://www.zjelevatorcontrolsystem.com