- Model NO.: 27SIMN
- Standard: AISI, ASTM, DIN, JIS, GB
- Technique: Hot Rolled
- Surface Treatment: Hot Rolled
- Application: Petroleum Chemical
- Transport Package: Standard Packing Suitable Shipping by Sea.
- Origin: Tianjin China
- Type: Round
- Composition: Alloy
- Shape: Round
- Special Use: High-strength Steel Plate
- Trademark: shanghui
- Specification: 1/8′′-48′′ or DN6-DN1200 or 10.3mm-730mm
- HS Code: 73049000
Product Description                         Â
 Product Name | Chemical fertilizer equipment pipes /Special alloy steel Thick Wall Seamless Steel Pipe and tube /carbon steel tube |
 Product material |
ASTM, DIN, GB, JIS, ASTM A335-2006, ASTM A335M-2006, DIN 17175, GB 5310-1995, GB/T 8162-1999, GB/T 9711.2-1999, JIS G3446-2004, JIS G3467-2006 |
 Standard | ASTM, DIN, GB, JIS, ANSI A213M-2001, ASTM A213-2001, ASTM A335-2006, ASTM A335M-2006, DIN 17175, GB 5310-1995, GB 9948-2006, GB/T5310, JIS G3458-2005, JIS G3462-2004, JIS G3467-2006 |
 Grade | A53-A369, Cr-Mo alloy, STBA20-STBA26, A333 Gr6, A335 P1, A335 P11, A335 P12, A335 P23, A335 P5, 10CrMo910, 12Cr1MoV, 12Cr1MoVG, 13CrMo44, 15CrMoG, 35CrMo4, STBA23, STBA24, STBA25 |
 Usage | Seamless steel pipe used in Petroleum,Chemical Industry,Electric,and Boiler fields with cold&heat resisting properties,erosion resistance,high-pressure boiler,Chemical fertilizer equipment,pipeline,also used as Fluid transmission pipes,shipping building with Bart tolerance etc |
 MOQ | 5Tons/Size |
 Trade terms | FOB, CFR, CIF, EXW, etc. |
 Payment | T/T, L/C, etc. |
 Delivery time | 5 ~15 days after receipt of deposit, ASAP |
 Loading Port | TianJin  YanTai,  QingDao, , ShangHai port, China |

Production Process                          Â
Chemical fertilizer equipment pipes /Special alloy steel Thick Wall Seamless Steel Pipe and tube /carbon steel tube
Compamy Information    Â
Chemical fertilizer equipment pipes /Special alloy steel Thick Wall Seamless Steel Pipe and tube /carbon steel tube
Â
Imported metallographic microscope test machine and precise specise spectral machine,WCK test machine,special tensile test,flatting test and impact test etc.Which can meet the inspection and test requirement and ensure the quality of product.
Packing & Transportation  Â
Â
        Â
FAQ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
ÂÂ Q: Are you trading company or manufacturer ?
  A: We are factory.
 Q: How long is your delivery time?
  A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is   according to quantity.
 Q: Do you provide samples ? is it free or extra ?
  A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
 Q: What is your terms of payment ?
  A: Payment>=1000USD, 30% T/T in advance ,balance before shipment.
          Â
The bending and forming of the metal plate is carried out on the bending machine. Place the workpiece to be formed on the bending machine, lift the brake shoe with the lifting lever, slide the workpiece to the proper position, and then lower the brake shoe to the workpiece to be formed, and realize the bending of the metal by applying force to the bending lever of the bending machine.
Sheet Metal,Forming Mount Unit,Laser Cutting Cover,Sheet Metal Forming Process
Dongguan Formal Precision Metal Parts Co,. Ltd , https://www.formalmetal.com